• Comprehensive Water Plans
  • Water System Management Programs
  • WaterCad Modeling
  • Reservoir Design
  • Booster Station Design
  • Water Source Approval
  • Metering System
  • Well Design
  • Funding Applications
  • Hydrant Flow Testing
  • Wellhouse and Well Pump Design
  • Distribution System Design
  • Construction Inspection
  • SCADA Control System Assistance
  • Plans, Specifications and Bid Documents
  • Bidding Process
  • Project Administration
  • Construction Inspection

Mesa Water System

Construction Cost:       $1,412,000
Engineering Cost:        $   262,000
Public Works:              Cade Scott

Included: Funding applications, SEPA, NEPA, Cultural Resource Survey, Design, Bidding,  Project Inspection and Project Administration.

Design included: 2 miles of water line, 250,000 gallon reservoir, new domestic well, wellhouse, booster station, radio telemetry system, SCADA controls, boring across a highway and integration with existing system.

Coordinated Project with:

  • City of Mesa
  • Department of Health Regional Office
  • Department of Ecology
  • Washington Department of Natural Resources
  • Washington Department of Fish and Wildlife
  • Washington Office of Archaeology and Historic Preservation
  • Franklin County
  • Washington State Department of Transportation
  • Department of Commerce

Reservoir #2 – Mesa WA

Booster Station – Mesa WA

Benton City Well #5

Construction Cost:       $435,000
Engineering Cost:        $  87,000
City Clerk:                   Stephanie Haug
Public Works               Kyle Kurth

Engineering Included: Funding applications, SEPA, NEPA, Cultural Resource Survey, Design, Bidding, Project Inspection and Project Administration.

Design included: new well construction, pump house, pump with pitless adaptor, VFD for pump and chlorination system.

Coordinated Project with:

  • City of Benton City
  • Department of Health Regional Office
  • Department of Ecology
  • Washington Office of Archaeology and Historic Preservation
  • Department of Commerce

Benton City Well Drilling

Kahlotus Water System Upgrade

Construction Cost:       $598,000
Engineering Cost:        $131,000

Engineering Included: Funding applications, SEPA, NEPA, Cultural Resource Survey, Design, Bidding, Project Inspection and Project Administration.

Design included: new 250,000 gallon reservoir, boring under state highway, one mile of water line, new pump house, radio telemetry system, integration with existing system, radio read water meter system and develop water meter reading program.

Coordinated Project with:

  • City of Kahlotus
  • Department of Health Regional Office
  • Department of Ecology
  • Washington Office of Archaeology and Historic Preservation
  • Department of Commerce
  • Washington State Department of Transportation

Kahlotus Reservoir #2

Kahlotus Reservoir #2

Kahlotus Pumphouse